Ineos to double capacity of proposed USGC EO-EOD plant

Ineos is planning to double the size of subsidiary Ineos Oxide’s proposed ethylene oxide and ethylene oxide derivatives plant to be built somewhere along the US Gulf Coast. Part of Ineos’ plan to address a fast-growing EO merchant market as well as the operator’s own requirements, the new plant—which will now produce 520,000 tonnes/year of EO—is slated to be operational sometime in 2023, Ineos said.


Source: News